Data center capacity is measured in megawatts (MW) because this quantifies the total electrical power available to run IT equipment, cooling systems, and other critical infrastructure, reflecting both energy demand and scalability.

Join Data Center Asia Malaysia 2025
Don’t miss Data Center Asia Malaysia 2025, part of Smart Nation Expo, where Malaysia’s data center ecosystem comes alive. Attend expert-led seminars, discover cutting-edge technologies, and network with industry leaders driving cloud, edge computing, and sustainable infrastructure across the region. Join us at DCA Malaysia 2025 – Register today!
Power as the Primary Constraint
- Heat and Power Relationship: Every watt of electrical power consumed by servers ultimately converts to heat that must be removed. The more computing equipment you add, the more power you consume and the more heat you generate. This creates a direct correlation between power capacity and the maximum amount of IT equipment a facility can house.
- Infrastructure Sizing: All major data center systems – cooling, backup power, electrical distribution – are designed around power requirements. When engineers design a data center, they start with the target power capacity and build everything else to support that electrical load. A 10 MW data center requires cooling systems capable of removing 10 MW worth of heat, backup generators rated for 10 MW, and electrical infrastructure to deliver 10 MW safely.
- Space vs Power: While data centers have physical space limitations, modern servers pack tremendous computing power into small form factors. Today’s constraint isn’t floor space – it’s power density. You can physically fit more servers in a rack than the power and cooling infrastructure can support.
Other Data Center Size Measurements Beyond MW
While megawatts (MW) is the primary capacity metric, data centers use numerous other measurements to evaluate performance, capacity, and operational efficiency across different dimensions.
- Square Feet/Square Meters: Data centers are measured by total facility size, raised floor space, and rentable space. Colocation providers often price services by square footage, particularly for smaller deployments where customers need specific floor space allocations.
- Rack Units (RU or U): Server equipment height is measured in rack units, where 1U equals 1.75 inches. A standard server rack is 42U tall. Colocation services frequently sell space in quarter-rack, half-rack, or full-rack increments.
- Rack Count: Facilities are often described by total rack capacity – a “500-rack data center” immediately conveys scale. This measurement helps with facility planning and customer capacity discussions.
Conclusion
Data center capacity is primarily measured in megawatts (MW) because power availability directly determines how much IT equipment a facility can support, given the heat generated and the infrastructure required for cooling and backup. While physical space and rack counts are also used to describe size, modern data centers are often constrained more by power and cooling capacity than by floor space. Understanding these measurements is essential for planning, scaling, and optimizing data center operations efficiently.